| 1. | These measures but also can result in higher failure rates and increasing risk of major failures 这些措施同样也可能会造成较高的故障率,同时还会增加发生主要故障的风险。 |
| 2. | Abstract : the major failure mechanisms of diamond coated cu tting tools are flaking and breakthrough of diamond coating 文摘:金刚石薄膜涂层刀具失效主要形式是膜剥落或膜被磨穿。 |
| 3. | Fretting wear and its induced fatigue and fracture of wires was one of the major failure modes of the hoisting ropes 摘要钢丝间的微动磨损以及由此引起的钢丝的疲劳断裂是提升钢丝绳失效的主要原因之一。 |
| 4. | Events are in process or have occurred which involve actual or likely major failure of plant functions needed for protection of the public 事故正在进展或已经发生,核电厂用以保护公众的一些功能实际上或已经较大程度丧失。 |
| 5. | Four major failure modes for high arch dams , namely destabilization dam lost stability failure , shearing - slipping failure , excess cracking and man - caused destruction , are presented by means of failure tree analysis 摘要利用故障树分析法得出了高拱坝具有失稳溃坝、剪滑垮坝、超量开裂及毁坝等4种主要失效模式。 |
| 6. | It is inherently capable of solving uncertainties , hedging risks and establishing warning system against major failures or collapse , thus achieving the goal of security and economy 信息化施工具有解决不确定性问题的能力,可降低风险、建立针对重大坍塌和破坏事件的报警系统,从而实现施工的安全和经济的目标。 |
| 7. | Based on the problem that cable - stayed bridge has many failure paths , modified / unzipping method was suggested to seek and identify major failure patterns to structural system reliability 摘要针对斜拉桥失效路径繁多的问题,采用改进的约界法限制分枝规模,寻找并识别对结构体系可靠度起主导作用的主要失效模式。 |
| 8. | Events are in process or have occurred which involve actual or likely major failure of plant functions needed for protection of the public . radiological consequences , which result or may result from the emergency , are confined to the site 事故正在进展或已经发生,核电厂用以保护公众的一些功能实际上或已经较大程度丧失。然而,事故中的辐射后果或可能引致的辐射后果只局限于场区范围内。 |
| 9. | The result shows that the trench wall failure at shallow depth is the major failure mode of the slurry - supported excavation , and that the length of the excavated trenches and the difference between the slurry head and the water level are the key parameters controlling the stability of the slurry - supported excavation 结果表明,浅层槽壁失稳是泥浆护壁开挖的主要失稳型式,开挖槽段的长度和泥浆液面与地下水位面的高差是控制泥浆护壁开挖稳定性的关键参数。 |
| 10. | Based on the calculation of shearing - slipping failure probability of high arch dams , the calculation method and procedures are presented by use of the second moment method for calculation of the occurrence probability of the major failure modes of high arch dams , and the relation degree between the major failure modes and the failure probability with multi - failure modes of the high arch dam are calculated 以计算高拱坝剪滑溃坝发生概率为例,说明利用二阶矩法计算高拱坝各主要失效模式发生概率的步骤,进而求解各失效模式的相关程度及具有多个失效模式高拱坝的失效概率。 |